About This Project

Drilling of a production borehole with pump installation and construction of a gravity-fed water distribution network serving 3 villages. The project includes a 50,000-litre elevated storage tank, 4km of pipeline, and 12 community water points.

Project Details

Category

Power, Water & Utilities

Location

Mbarara, Uganda

Duration

6 months (est.)

Status

Ongoing

Have a Similar Project?

Let us discuss your requirements.

Get a Quote